KRB II Band screen Installation


We have successfully completed the two band screens positioning at Intake of Kelani Right bank water supply project -Phase II collaborates with SUEZ (Contractor ) and NWSDB (Client).

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

Last Update: 01 January 2018

Copyright © 2018 Dilum BMK Engineers (Pvt) Ltd. All right reserved. Concept & Design by Chanaka_UOR

  • Facebook Social Icon
  • LinkedIn Social Icon
  • YouTube Social  Icon