November 17, 2017

Please reload

Recent Posts

Project office Opening for KRB II project

January 10, 2019

1/4
Please reload

Featured Posts

CRANES LOAD TEST AT DUNUMADALAWA

December 14, 2017

We were competed Monorail travelling crane for chemical dosing area and Single guider overhead travelling crane for the on going project which Rehabilitation of Dunumadalawa Water treatment plant.That occasion contributed from Squremech Engineering (Pvt) Ltd. [Client] , Water supply and drainage board of Sri Lanka [Consultant], Priyantha Withanarachchi Associates [Load testing Inspectors] with us.

 

 

 

 

 

  

Share on Facebook
Share on Twitter
Please reload

Follow Us

I'm busy working on my blog posts. Watch this space!

Please reload

Search By Tags
Please reload

Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

Last Update: 01 January 2018

Copyright © 2018 Dilum BMK Engineers (Pvt) Ltd. All right reserved. Concept & Design by Chanaka_UOR

  • Facebook Social Icon
  • LinkedIn Social Icon
  • YouTube Social  Icon